CIMA Study Pack: Stage 2 Paper 7 Information Technology Management/ by CIMA
By: CIMA
.
Contributor(s): CIMA
.
Material type: ![materialTypeLabel](/opac-tmpl/lib/famfamfam/BK.png)
![](/opac-tmpl/bootstrap/images/filefind.png)
Item type | Current location | Call number | Copy number | Status | Date due | Barcode |
---|---|---|---|---|---|---|
![]() |
IBB Library-Gidan Kwano | T58.4.6.C55 1987 (Browse shelf) | nc 1 | Available | 2342100407 | |
![]() |
IBB Library-Gidan Kwano | T58.4.6.C55 1987 (Browse shelf) | nc 2 | Available | 2342100410 | |
![]() |
IBB Library-Gidan Kwano | T58.4.6.C55 1987 (Browse shelf) | nc 3 | Available | 2342100398 | |
![]() |
IBB Library-Gidan Kwano | T58.4.6.C55 1987 (Browse shelf) | nc 4 | Not for loan | 2342125347 |
Browsing IBB Library-Gidan Kwano Shelves Close shelf browser
No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | No cover image available | ||
T56.8.C54.1998 Construction Project Management: | T58.4.6.C55 1987 CIMA Study Pack: | T58.4.6.C55 1987 CIMA Study Pack: | T58.4.6.C55 1987 CIMA Study Pack: | T56.8.C54.1998 Construction Project Management: | T56.8.C54.1998 Construction Project Management: | T56.8.c54.1998 Construction Project Management: |
There are no comments for this item.